This guide covers essential information for residents and property owners throughout Santa Rosa Beach, WaterColor, Seaside, and all 30A communities. For specific service needs, visit our services page or learn more about our commitment to environmentally responsible disposal and supporting local charities like Habitat for Humanity and Goodwill.
It depends on the shed size and whether it has utilities connected. Sheds under 100 square feet without utilities typically do NOT require a demolition permit in most Florida counties. Larger sheds, or any shed with electrical/plumbing connections, usually DO require a permit. Here is the specific breakdown for Walton County and Bay County (the 30A and PCB service area).
The general Florida rule
Florida Building Code applies statewide, but demolition permits are administered at the county level. Each county has its own threshold for when a permit is required. The two factors that universally trigger permit requirements:
- Size: Sheds over 100-200 sq ft (varies by county)
- Utilities: Any shed with electrical or plumbing service connections
Walton County demolition permits
For Walton County sheds:
| Shed Type | Permit Required? |
|---|---|
| Storage shed under 100 sq ft, no utilities | NO permit |
| Storage shed 100-200 sq ft, no utilities | NO permit (but check zoning) |
| Storage shed over 200 sq ft | YES — demolition permit required |
| Any shed with electrical service | YES — electrical disconnect permit |
| Any shed with plumbing | YES — plumbing disconnect permit |
| Pole barn or carport | YES — over 100 sq ft |
| Detached garage | YES |
Walton County Building Department contact: 850-892-8160. Permits typically take 5-7 business days and cost $50-150 for residential demolition.
Bay County demolition permits
For Bay County sheds:
| Shed Type | Permit Required? |
|---|---|
| Storage shed under 150 sq ft, no utilities | NO permit |
| Storage shed 150-300 sq ft, no utilities | YES (under "small structure" classification) |
| Storage shed over 300 sq ft | YES — demolition permit required |
| Any shed with electrical service | YES — electrical disconnect permit |
| Any shed with plumbing | YES — plumbing disconnect permit |
| Pole barn over 150 sq ft | YES |
| Detached garage | YES |
Bay County Building Department contact: 850-248-8350. Permits typically take 3-5 business days and cost $40-125 for residential demolition.
HOA rules — separate from county permits
For 30A and PCB sheds, HOA architectural review approval is often required IN ADDITION to county permits:
- Alys Beach: Strict ARC review required for any structural change. 7-14 day approval window.
- Rosemary Beach: Similar ARC review process.
- Watersound: ARC review required.
- Sandestin: Property owner association review.
- Watercolor: ARC review for structural changes.
Most 30A HOA approvals add 5-14 days to the timeline. Plan accordingly.
What happens during permitted demolition
If your shed requires a permit:
- Submit application — describe scope, structure dimensions, utility status
- Inspector pre-demo walkthrough (sometimes required) — confirms structure matches application
- Licensed contractor (often required for permitted demos) performs demolition
- Utility disconnections documented — electrical/plumbing capped to inspection-ready standard
- Debris hauled with disposal manifest documenting weight and destination
- Post-demo inspection — confirms full removal and proper disposal
- Permit closed
Cost: Permitted shed demolition (over 200 sq ft with utilities) typically runs $1,200-$3,500 total, including the permit, licensed contractor, debris haul, and inspection fees.
Sheds under permit threshold
For sheds under the permit threshold (most residential storage sheds in 30A):
- No permit required
- No licensed contractor required
- No inspection required
- HOA approval still applies if you are in a covenant community
- Disposal is still your responsibility — you cannot just leave the demoed shed in your yard
DIY demolition of a small unpermitted shed is legal. Professional shed demolition service is also an option — typical pricing $600-$1,400 for under-permit sheds.
What we handle
For 30A and PCB shed demolition:
- Sheds under permit threshold: standard demolition + haul, no permit work
- Sheds over permit threshold: coordinate with licensed contractor + permit, handle debris haul
- HOA-restricted communities: coordinate with property manager and HOA architectural review
- Utility disconnects: route to licensed electrician/plumber for the disconnect, we handle the structure and haul
Common questions
Q: What if I demo my shed without a required permit?
A: Code enforcement can issue stop-work orders, fines ($250-1,000 typical), and require you to bring the permit current after the fact. Property sale can be complicated if unpermitted work is discovered during inspection.
Q: Are pre-fab sheds (like Tuff Shed) easier to demolish?
A: Yes — pre-fab sheds are designed for disassembly. They can often be unbolted and removed in sections. This makes the demolition cleaner and the debris easier to haul.
Q: What about hurricane-damaged sheds?
A: Damage assessment may waive permit requirements under emergency declarations. After Hurricane Michael (2018), Bay County issued blanket waivers for hurricane-damaged accessory structures. Check current emergency declarations.
Q: Can I just leave the shed and let it fall down?
A: No — code enforcement classifies derelict structures as nuisances. You will eventually be cited and required to demolish (sometimes with a contractor lien on your property if you do not comply).
Ready to Get Started?
Same-day junk removal service available throughout 30A.
Frequently Asked Questions
Have more questions? Check our full FAQ page or contact us for personalized assistance with your junk removal needs.
1Do you need a permit to demolish a shed in Florida?
It depends on size and utilities. Sheds under 100 sq ft in Walton County (150 sq ft in Bay County) without utilities typically do NOT need a permit. Larger sheds, or any shed with electrical or plumbing connections, DO require a permit. HOA architectural review approval may also be required separately.
2How much does a shed demolition permit cost in Florida?
Walton County permits run $50-150 for residential demolition. Bay County permits run $40-125. Permits typically take 3-7 business days for approval. Costs vary based on shed size and whether utility disconnect permits are also required.
3What is the largest shed I can build/demolish without a permit in Florida?
In Walton County: up to 100 sq ft without permit (no utilities). In Bay County: up to 150 sq ft without permit (no utilities). These thresholds apply to demolition as well. Always confirm with your specific county building department.
4Do I need HOA approval to demolish a shed?
In most 30A and PCB HOA communities (Alys Beach, Rosemary Beach, Watersound, Sandestin, Watercolor), yes — architectural review committee approval is required separately from any county permit. Approval typically adds 5-14 days to the timeline.
5What happens if I demo a shed without a required permit?
Code enforcement can issue stop-work orders, fines ranging from $250-$1,000, and require you to bring the permit current after the fact. Unpermitted work can complicate property sales when discovered during inspection. For any shed over the permit threshold, getting the permit is significantly cheaper than the potential fines.
Written by
30A Junk Removal Team
Locally Owned & Operated at 30A Junk Removal. Serving the 30A corridor with professional junk removal, estate cleanouts, and property management services. Committed to eco-friendly disposal and supporting local charities.